225 Unit Townhouse
This 225 unit site started in October 2015. We are at a pace of around 100 units a year doing both the concrete and the framing. We should be done by the end of 2017.
Six Storey Building in Tsawwassen
Our second building at Tsawwassen Springs. We framed all the exterior walls and columns and installed the windows.
168 Unit Townhouse - Langley, BC
Highpoint is doing both the framing and forming of this 143 unit townhouse site in Langley. We started it in may and should be complete by January 2018.
Apartment in Burnaby
A three level apartment building on top of a parkade and commercial level.
110 Unit Townhouse - Phase 2
We will be completing the remaining 84 units over the next year.
Tsawwassen Springs Golf Club
We framed the Tsawwassen Springs Golf Course clubhouse. It is approximately 34,000 sq feet.
Maple Ridge Apartment
4 storey apartment in Maple Ridge. We are doing the framing only on this project. We started on February 3rd and expect to be completed by the end of March.
Mason & Green
Phase 2 of a townhouse site in Langley. This phase has 42 units. We are doing form work and framing on this site. Started this phase in mid-March and will complete it in July.
Langley Town Homes
Phase one of a 120 unit town home site in Langley. We started this project in August 2013 and will complete it by year end. We are doing both the forming and framing on this site.
Commercial Residential Building on Main & King Edward
This building has three levels of underground parking and one level of commercial at street level. Above that are three levels of residential apartment units. Highpoint will be doing all the concrete forming and framing of this building. Project began in April 2013 and completed September 2013.
Commercial & 2nd
Four-story apartment complete with underground parking on Commercial and 2nd in Vancouver. Highpoint completed both the framing and concrete forming of this project. We began this building in April 2013 and completed July 2013.
Commercial & Residential Complex in White Rock
This is a commercial and residential complex in White Rock. We began framing in May 2013 and completed in July 2013.
Ashbury
This is a 60 unit site in Surrey. We began phase one in October 2012 and completed both forming and framing by January 2013.
Eton
This is a 65 unit site in Surrey. We began forming in December 2012 and finished in March 2013.
Cedar Creek - Phase 2
This is the second phase of a total 80 unit site on Burke mountain. It has been a difficult site due to the slope of the land. Concrete walls were up to 15 feet high with each unit stepping 18 inches. The second phase (31 units) was completed in April 2012.
Hartwell
Hartwell is a 64 unit townhouse site in Abbotsford. We did the forming and the framing on this project. We started in late September 2011 and completed in March 2012.
Red Maple Park - Phase 2
A Polygon project of two and three bedroom townhomes in Langley, BC. We are did the forming and framing. We completed all four phases in November 2012.
Promenade
Underground parkade for apartment in White Rock, BC. We did the concrete form work for this project.
White Rock Custom Home
This is a 17,000 square foot home complete with a large carriage house, shop, underground storage facility, conservatory and a 4000 square foot quest house. This project is being built with the utmost of quality by all trades, suppliers, and consultants. Highpoint Construction is proud to be part of this team.
Cedar Creek
This project consisted of 82 units on Burke Mountain. The concrete forming began on December 2010 and was completed April 2011.
Kensal Walk
In November 2009 we began phase 1 which consisted of 48 units. We did both the forming and the framing and complete it in March of 2010 We began Phase 2 in April 2010 and completed it in August 2010. Phase 3 was completed Spring 2011. This site consists on 108 total units.
Nakoma Club
We began this beautiful 15000 square foot club house at the Windsor Gate site in July 2010. We completed both the concrete formwork and the framing for this fine project.
Red Maple Park Phase 1
We began this project consisting of a 51 unit and Amenity building, in late summer of 2010 and completed it just before Christmas 2010. We did both the forming and framing.
Kaleden 185 Unit Project
We completed Phase 2 in March 2009 59 units, which we started in October 2008. We also completed Phase 3 and 4 in April of 2010.
Cathedral Grove
We completed Phase 1, 3, and 4 of Cathedral Grove in South Surrey. We completed these phases in May of 2010.
Delta - 57 unit townhouse project in Delta. Highpoint will be doing both the forming and framing of this project. we began construction of Phase 1 in late August 2008 and completed the project in February 2009.
Cloverdale - 60 unit apartment building complete with underground parkade in Cloverdale. This project we began in January 2008 and completed the project in November 2008. Highpoint did both the forming and framing on this project.
Cathedral Grove - Cathedral Grove is the 1st phase of a 145 unit town home site complete with large amenity building in South Surrey. We began this project in Nov.07 and will be complete in the spring of 08. We are doing both the concrete forming and the framing on this project. This phase contains 40 units.
Kaleden - Kaleden is the 1st phase of 186 unit site in South Surrey. We will be doing all the concrete forming and framing on this first 57 unit phase. We began this project in Nov.07 and anticipate completion in the spring of 08.
Phases 2 and 3 of Pepperwood and Arborel - We are happy to be continuing this project in Langley for Polygon. We did the first phase of Pepperwood (forming and framing) and the forming only for Arborel. In phases 2 and 3 of both of these projects we will be doing both the forming and the framing. We started phase 2 of Pepperwood in Feb 06 and are beginning Arborel in April. We anticipate being on these two projects for the rest of 2007.
Large custom home in South Surrey - - We are pleased to be involved with this unique project by Omer Arbel, (Architect). Many of the walls are between 10 and 16 feet high and are being tilted at 15 degree angles. They are then insulated and another interior wall is poured against them like a sandwich. Highpoint is also preparing and installing all of the reclaimed wood beams. This will be another very special home when it is completed.
93 unit townhouse site in Langley - We are doing both the formwork and framing of this project. We started in late November and should complete by mid summer. This is our first project for Marcon Construction and we are happy to be associated with them.
124 Unit townhome site in Surrey (19 images) - We began this site early in this new year and expect to complete it by late summer. We have our pre-fab factory set up for the framing and are also doing the form work.
Yorkson Townhomes in Langley. Highpoint is doing the Forming and Framing of the Pepperwood site as well as the forming only on the Arborel site. We began the site in mid May and will complete the first phases of both projects by the end of November. We anticipate starting the second Phases early in the new year. There are 58 units and large Amenity building in Pepperwood as well as 36 units in Arborel in this first phase.
Balmoral is a 28 unit townhouse site that we are doing for Opal Developments.
We are doing the framing only on this site. We started in Feb of 2006 and hope to complete it by the end of April.
60 Unit townhome site (15 images) - Highpoint is doing the framing only of this site. We started in Sept.05 and expect to be complete in Feb. 06.
93 Unit Townhouse Site in Langley (9 images) -Highpoint will be doing both the forming and the framing of this site. Project began in May 05 and we anticipate it completing early in the new year. This is our 3rd project in the last two years for this contractor.
163 Unit (42 images) - Sagebrook is a 163 unit townhouse site in Langley. It is one of 3 projects which we are currently doing for this contractor. We completed Phase one and two over the past year and are currently working on phase three. We anticipate completing this phase in the fall of 05.
50 unit townhouse site in Ladner (5 images) - Highpoint is just doing the forming of this project. We anticipate completion by mid July
90 unit townhouse site in Surrey. (10 images) - We began the 2nd Phase of this project in mid Febuary and completed this Phase in mid May. Currently we are working on the 3rd Phase which we anticipate to be complete in mid summer. Highpoint is doing the framing only on this project.
95 Unit Townhome site (18 images) - Sunridge is a 95 unit townhouse site situated on a steep grade in Langley. Highpoint is doing all the formwork and framing for this project. Our scope of work began in April 04 and is progressing well. We anticipate completion in mid March 05.
88 Unit Townhome site (19 images) - Huckleberry is an 88 unit townhome site which we started in December 2003. We completed the 43 units of Phase 1 in March 2004. We started Phase 2 in July of 2004 and completed these 45 units in November of 2004.
Chestnut Grove (5 images) - Highpoint construction did the forming only of this 50 unit townhome site. Our scope of work began in Jan.04 and completed in April 04.
186 Unit Townhome Site With Amenity Building (3 galleries) - 186 Unit Townhome site complete with amenity. Highpoint completed this 4 Phase project in October 2003, after starting it in November of 2002. They were responsible for formwork and framing, and completed the project on time and to the satisfaction of the client; Polygon Construction. References are available upon request.
65 Unit Townhome Site (21 images) - This 65 unit Townhome project began in March 2003, and was completed in September 2003. Highpoint completed both the formwork and framing, and was able to complete project ahead of schedule to the satisfaction of the client; Solterra Construction. References available upon request.
Semiahmoo House Society Building (12 images) - Highpoint completed both the forming and framing on this project. It has a full 12ft. basement and is a true post and beam structure. Highpoint pre-cut and pre-drilled all the heavy timber for this building at a remote location so it could all be weatherproofed before assembly. This was a very intricate job and we are proud to be part of the team that built it. Please contact us for a list of references.
Shelborne (15 images) - A 70 unit townhome site which went from start to finish in 4 months starting April 2002, and completed by August 2002. Highpoint did both the formwork and the framing, and exceeded all expectations making the customer, Polygon Construction, very happy.

Steeplechase (2 phases) - This was the second phase which consisted of 48 townhomes in Langley, B.C. This project was started in February 2003 and completed by June 2003. Highpoint completed both the formwork and the framing. To increase efficiency, Highpoint completed all of the framing off site by their own forces and trucked the walls to the site when they were needed. This site was also completed for Polygon Construction.


For further information about any of these projects, or to receive further information about obtaining Project References, please contact our office at (604) 857-1220, or click here for our email form.